Instruction Manual for Installing Cup-Making Machine Mold制杯机模具安装操作说明书
Time: 2026-03-11 14:04:55.373
Mould Installation Operating Instructions for Cup Making Machine
I. Preparation:
1. Loosen all the nuts on the upper template and rotate them upwards, leaving a few centimeters of space from the mould base; wipe the upper template surface clean.
2. Place the lower template at its lowest position, wipe the lower template surface clean.
3. Measure the length of the mould body that needs to be installed, and adjust the width of the chain track according to the measurement value (the width of the chain track should be greater than the length of the mould body).
II. Operation:
1. Install the upper mould: Use a forklift to position the upper mould over the installation hole and lock the screws (note the direction: the side with the quick connector should face forward).
2. Install the lower mould: Use a forklift to place the lower mould into the lower template (note the direction: the side with the quick connector should face forward), attach the screws (do not lock them), and insert the four joining pins into the corresponding holes.
3. Align the mould: Turn on the alignment switch, slowly close the mould manually, allowing the joining pins to enter the corresponding pin holes of the upper mould (during the process, slightly adjust the front, back, left, and right positions of the lower template). Ensure that all four pins are completely aligned in the upper and lower moulds and can be easily rotated.
4. Lock the template: Slowly close the mould manually, allowing the lower cutting edge to enter the upper cutting edge approximately 0.3 to 0.5 mm, and fully extend the five-point curved arm, manually rotate the lower nut at the position of the upper template guide column to make it fully adhere to the upper mould, then turn the upper nut and tighten it.
5. Lock the lower mould: Slowly open the mould to separate the pins from the upper mould, then slowly close the mould, check that the rotation of the joining pins is without resistance, and then allow the lower cutting edge to enter the upper cutting edge, evenly lock the screws of the lower mould.
6. Install the screw between the upper mould stretch plate and the stretch connection plate, adjust the length evenly and lock it.
7. Cylinder for cup pressing: Connect the screws of the lower mould pressing cylinder to the pressing plate, then adjust the length of the pressing limit rod according to the product height.
8. Mechanical pressing of the cup: Adjust the height of the pressing rod according to the product height.
9. Finally, connect the water pipes and air pipes according to the inlet water and air ports reserved in front of the mould.
制杯机模具安装操作说明书
一 准备工作:
1、上模板上螺母全部放松并旋转上去,距离模台预留几公分空间;模板平面擦拭干净。
2、下模板放到最低,模板平面擦拭干净。
3、先测量需要安装模具的模体长度,根据测量数值调整链轨的宽度(链轨宽度>模体长度)。
二 操作:
- 安装上模:使用叉车把上模对准安装孔,并锁紧螺丝(注意方向:有快接头的这面朝向前面)。
- 安装下模:使用叉车把下模叉放进去下模板(注意方向:有快接头的这面朝向前面),把螺丝带上(不锁紧),并把四个合模销钉放进对应孔位。
- 校模:打开校模开关,手动慢速合模,让合模销钉进入上模对应销钉孔(过程当中需轻微调整下模前后左右位置),达到四个销钉上下模具都完全对位并且可以轻松转动销钉。
- 锁上模板:手动慢速合模,让下剪口进入上剪口大约0.3~0.5mm左右,并且五支点曲臂完全伸直,用手旋动上模板导柱位置的下螺母,使其完全与上模贴合,再旋动上面螺母并打紧。
- 锁下模:手动慢速开模到销钉与上模脱离,再手动慢速合模,检验合模销钉转动无阻力,再次让下剪口进入上剪口,再均匀锁紧下模螺丝。
- 安装上模拉伸板与拉伸连接板的之间的螺杆,调整长度均匀并锁紧。
- 气缸顶杯:连接下模顶杯气缸与顶杯板的螺丝,再根据产品高度调整顶杯限位杆的长度。
- 机械顶杯:根据产品高度,调整顶杯杆的高低。
- 最后根据模具前面预留进出水口和进气口连接水管、气管。
Related News
Contact Us
China Shantou Longsheng Industry Co., Ltd.
Address:No.44 Xigang Road, Shantou, Guangdong, China
Mob: +86-13302710116
Shiela:+86-15362312727
E-mail: longshengmachine@gmail.com
TikTok