WELCOME TO SHANTOU

WELCOME TO SHANTOU

Cup Making Machine Maintenance Sheet


Time: 2024-10-21 13:58:48.311

Cup Making Machine Maintenance Sheet

 

NO

ITEM

POSITION

Maintenance period

Remark

1

Chain rail chain

Chain tensioning and lubrication(All the left and right chain tracks are removed and checked Chain rail, chain, bearing, gear have no grinding Clean the dirt with a diesel copper brush to avoid product black spots.)

Half a month/time

 

2

Mold Table lubrication

oil lubricator quantity, oil tube checking

Per shift

 

3

Stretch lubrication

oil lubricator quantity, oil tube checking

Manual 3~4 times per shift

 

4

Die closing reducer

Gear oil (Mobil/Shell 320# Gear oil)

Six months replace the first time,and form then on replace one year/time

Servo machine

5

Clamping hydraulic station

Hydraulic fluid (46# or 68# antiwear hydraulic fluid)

Six months replace the first time,and form then on replace one year/time

Hydraulic machine

6

Sheet feeding reducer

Gear oil (Mobil/Shell 320# Gear oil)

Six months replace the first time,and form then on replace one year/time

 

7

Five fulcrum, mold table

Each screw fastens the locking part

Half a month/time

 

8

Gas tank, gas path

Drainage and waste disposal

Once a week(recommended for each shift)

 

9

Waterway

Empty and remove scale

Shift change or when stop machine for more than two days

 

10

Electric box, electric cabinet

Power off, dust removal, and lock terminals

Half a month/time

 

11

Machine should be placed horizontally

The footing of the machine regulates the balance state

Half a year/time

 

Attention please:The machine must be powered on after the water is passed, and it is necessary to check whether there is water leakage, air leakage and electricity leakage before starting each time to ensure safety.

 

Related News