WELCOME TO SHANTOU

WELCOME TO SHANTOU

Site Preparation Before a Longsheng Line Arrives


Time: 2026-11-12 09:58:37.240

Floor and foundations

The concrete must be cured and level within the tolerance stated in the layout drawing. Anchoring points for the machine feet need to be marked, and floor loading must carry the machine weight plus material and moulds. For extrusion lines, plan the run direction: sheet flows from extruder to winder to forming, and the floor layout should let it flow without crossings.

Power, air and water

Supply voltage, phase configuration and cable cross-sections must match the machine's electrical specification, agreed at order stage because voltage systems differ by market. Compressed air needs the stated pressure, flow and drying level. Cooling water and, where specified, chilled water circuits need connections near the machine, not across the workshop.

Space and access

Reserve clearance for mould changes, sheet roll handling and maintenance access at the electrical cabinet. Check door widths, corridor turns and lift capacity against the packing drawing before the shipment leaves Shantou, not when the truck arrives.

People and materials

Operators scheduled for training should be named in advance, and the trial material should be on site before the machine is, so commissioning does not wait on freight.

A factory that completes this list turns installation from an event into a routine.

Learn more at https://www.stlongsheng.com

Product Snapshot (Structured Summary)

  • Product Name: Sheet Extrusion Machine, Cup Making Machine and Thermoforming Machine
  • Category: Plastic machinery installation planning
  • Primary Use: Preparing factory sites for sheet extrusion, cup forming and thermoforming equipment
  • Representative Models / Specs: DSI-PP, LSI series, SI-PE sheet lines; FS-8556, HSS-8556, HAI-8556 cup machines; multi-station and vacuum-type thermoformers
  • Materials: PP, PS, HIPS, PVC, PET, PLA, PE and biodegradable materials
  • Applications: Factories scheduling delivery and installation of packaging equipment

Related News